Monthly Sale!
LBK 360ml (12oz) White Plastic Bowl (Fit PG/GG120LID) 600/cs
Item code: B08-LBK-360Wwas CA$40.50
now CA$36.45
LRR 24oz (R24) White Round Container 150set/cs
Item code: B08-LRR-JR24was CA$29.89
now CA$25.41
LRR 24oz (E24) White Rectangle Container 150set/cs
Item code: B08-LRR-LR24was CA$30.91
now CA$26.27
12oz Semi-Clear Plastic Container with vent Lids 250sets/cs
Item code: B09-LRR-S12HOLEwas CA$34.09
now CA$28.98
LRR 48oz (T48) White Square Container 100set/cs
Item code: B08-LRR-JE48was CA$44.63
now CA$37.94
LRR 1000ml (JW1000) Clear PP Container with Lid 250set/cs
Item code: B08-LRR-1000MLwas CA$49.85
now CA$42.37
#1 26oz Kraft Togo Food Box 5x4.5x2.5" 450/cs
Item code: B11-OME-TCN301was CA$56.72
now CA$48.21
Clear PET Lid for KB750PACK300 Kraft Paper Salad Bowl 300/cs
Item code: A01-OME-PET750LPACK300was CA$33.84
now CA$27.07
45cm*100m Foil Roll Standard Cutter Box 798195 1roll/bx
Item code: T01-WPI-1810Pwas CA$24.37
now CA$20.71
FBM 250ml (8oz) White Plastic Bowl (Fit JC95L) 1000/cs
Item code: B08-OME-FBM250was CA$71.57
now CA$64.41
Green Fabric T-Shirt Bag 13+7x23 (XL) 40GSM 300/cs
Item code: H02-OME-FBTB12723Lwas CA$66.94
now CA$46.86
180 Clear Lid for KB1300 44oz Shallow Paper Bowl 300/cs
Item code: R03-PEK-TNTC26FLIDwas CA$28.06
now CA$14.03
#4 96oz Kraft Togo Food Box 8.5x6.25x3.5" 160/cs
Item code: B11-OME-TCN304was CA$52.89
now CA$44.96
#8 48oz Kraft Togo Food Box 6.75x5.5x2.5" 300/cs
Item code: B11-OME-TCN308was CA$52.84
now CA$44.91
New Arrival
LRR 36oz White Noodle Bowl (Fit NB1100LID) 300/cs
Item code: B08-LRR-NB1100BASEwas CA$34.97
now CA$29.72
LRR 36oz Clear Noodle Bowl Lid (Fit NB1100BASE) 300/cs
Item code: B08-LRR-NB1100LIDwas CA$23.97
now CA$20.37
PP White Hinged Container 8.8x5.7x3" 150pcs/cs
Item code: B07-LRR-EP188was CA$19.47
now CA$17.52